The Result
The order was designed, produced and supplied within 8 days. Our flexibility and local production helped to relieve pressure and reduce shipping time. Unlike previously, products were delivered safely on pallets eliminating damage and reducing manual labour plus we supplied a box assembly machine which hugely reduced labour costs. Oh Polly now have a local supplier, cost savings across the supply chain, reduced Co2 emissions and stand-out 100% recyclable packaging.